Steel Pipes For (EPC) for New Nassiriya Depot Project, Iraq
项目名称: | Steel Pipes For (EPC) for New Nassiriya Depot Project, Iraq |
项目概况: | Project Name: Engineering, Procurement and Construction (EPC) for New Nassiriya Depot Owner: State Company for Oil Project (SCOP) Nassiriya New Crude Oil Depot with a working capacity of about four million barrels (637,000 M3) is the proposed depot to accommodate the produced crude from the following fields: Ahdeb Field, Badra Field, Gharaffield, Nassiriya field and Abu Amood field. Total capacity shall be about four million barrels (637,000 M3), for Phase (I) it shall be 2.52 million barrels (401,000 M3), and for Phase (II), it shall be 1.26 million barrels (200,500 M3).CPP win to build all tanks for phase (I), including 7 Floating roof tanks (66000m3), and their accessories. Two relief tanks(23000 m3), capacity of each tank is 23000 m3 , one for heavy & the other for light crude oil .Two fire water steel tank of 10,000 m3 Capacity from continuous water supply. The project is planned to be completed prior January, 2026. |
项目单位: | 管道局国际事业部 |
项目类别: | 物资类 |
项目分类: | 三类 |
供应商资格要求: | Refer to Negotiation Documents for Steel Pipes for EPC for New Nassiriya Depot Project, Iraq "3.Requirements For Bidder" |
采购文件的获取: | This Negotiating announcement is issued on: https://www.cnpcbidding.com/ |
*其他: | 无 |
本公告的详情仅对VIP会员或SVIP员查阅,您当前的权限无法查看完整内容,请先 登录 或 注册 ,联系业务经理办理会员入网事宜。
联系人:张晟
手 机:13621182864
邮 箱:zhangsheng@zgdlyzc.com